CONTACT US
Share: Share on Facebook Share on Twitter Share on LinkedIn I recommend visiting cushmanwakefield.com to read:%0A%0A {0} %0A%0A {1}
dccg2025-desktop.jpg dccg2025-mobile.jpg

Asia Pacific Data Centre Construction Cost Guide 2025

James Normandale • 1/16/2025

Our 2025 report provides a comprehensive analysis of both land purchase and data centre construction costs to assist data centre operators, developers, investors and lenders looking to better understand the sector’s capital requirements.

Drawing on Cushman & Wakefield data from 90 clusters across 26 data centre locations, the report provides detailed modelling and cost scenarios along with insights into key themes influencing the sector’s development: power availability and cost, AI, and investment trends.

Data Centre Construction Costs

Data centre construction costs continued to rise in 2024, albeit more slowly than in prior years as supply chain stress continued to ease. Regionally, construction cost inflation of 3.8% off last year’s record high base reflected ongoing demand within the sector.

Only India and Australia saw the rate of construction inflation increase, in both cases primarily driven by strong demand from both local and international players. In all other markets, the rate of inflation has slowed or plateaued as demand/supply for materials reconciles into post-pandemic norms.

India, Australia and Indonesia saw the greatest increase in construction costs (5%) while Hong Kong, China saw the slowest rate of inflation (2.1%).

The top five most expensive construction markets have remained unchanged from last year, albeit ranked differently.

 

Most Expensive Markets

(ranked by mid-range cost and based on a mid-specification build)

  1. Japan
  2. Singapore
  3. Australia
  4. South Korea
  5. Greater China, Hong Kong

Land Purchase Costs*

Land costs continued to rise in 2024 as an increasing scarcity of powered sites suitable for data centre construction in established markets drove interest in emerging markets. This scarcity of land has encouraged a move towards innovative redevelopment of brownfield sites.

*Note that our methodology for calculating land costs has changed to reflect cluster pricing rather than market pricing; year-on-year comparisons are not available.

Most Expensive Clusters

(ranked by mid-range land)

Inner City Clusters

  1. Gangnam, Seoul, South Korea
  2. Neihu District, Taipei, Taiwan China
  3. Central Tokyo, Greater Tokyo, Japan
  4. Central Jakarta, Greater Jakarta, Indonesia
  5. South West Seoul, Seoul, South Korea
 
 
Outer CBD Fringe Clusters
  1. Kawasaki, Greater Tokyo, Japan
  2. Sha Tin, Hong Kong, Greater China
  3. Seongnam, Seoul, South Korea
  4. Fanling, Hong Kong, Greater China
  5. Sagamihara, Greater Tokyo, Japan
$name

related insights / news

APC Data Centre Construction per Capita_News Card Image.jpg
Malaysia, Thailand, Japan set pace on Asia Pacific data centre construction per capita through end of decade

Malaysia’s strong data centre development pipeline will see its population per megawatt ratio consolidate faster than any other Asia Pacific market between now and the end of the decade, with Thailand and Japan seeing the second and third fastest rates of consolidation, according to a new report from global real estate services firm Cushman & Wakefield.

Amy Kathleen Kelly • 6/12/2025

APAC Data Centre CCG 2025-card.png
Cushman & Wakefield report release: Asia Pacific Data Centre Construction Cost Guide 2025

Cushman & Wakefield is pleased to announce the release of the latest edition of its Asia Pacific Data Centre Construction Cost Guide.

1/31/2025

Cushman & Wakefield wins Data Centre Market Intelligence Award at Asia Pacific W.Media Awards.jpg
Cushman & Wakefield wins Data Centre Market Intelligence Award at Asia Pacific W.Media Awards

Cushman & Wakefield is pleased to announce it has been named winner in the Data Centre Market Intelligence Team category at this year’s W.Media Awards in Singapore.

Amy Kathleen Kelly • 12/10/2024

CAN'T FIND WHAT YOU'RE LOOKING FOR?

Get in touch with one of our professionals.

With your permission we and our partners would like to use cookies in order to access and record information and process personal data, such as unique identifiers and standard information sent by a device to ensure our website performs as expected, to develop and improve our products, and for advertising and insight purposes.

Alternatively click on More Options and select your preferences before providing or refusing consent. Some processing of your personal data may not require your consent, but you have a right to object to such processing.

You can change your preferences at any time by returning to this site or clicking on Privacy & Cookies.
MORE OPTIONS
AGREE AND CLOSE
These cookies ensure that our website performs as expected,for example website traffic load is balanced across our servers to prevent our website from crashing during particularly high usage.
These cookies allow our website to remember choices you make (such as your user name, language or the region you are in) and provide enhanced features. These cookies do not gather any information about you that could be used for advertising or remember where you have been on the internet.
These cookies allow us to work with our marketing partners to understand which ads or links you have clicked on before arriving on our website or to help us make our advertising more relevant to you.
Agree All
Reject All
SAVE SETTINGS