Asia Pacific Data Centre Construction Cost Guide 2026

Pritesh Swamy • 3/31/2026

Our 2026 report provides a comprehensive analysis of both land purchase and data centre construction costs to assist data centre operators, developers, investors and lenders looking to better understand the sector’s capital requirements.

Drawing on Cushman & Wakefield data from 90 clusters across 26 data centre locations, the report provides detailed modelling and cost scenarios along with insights into key themes influencing the sector’s development: power availability and cost, AI, and investment trends.

In this 2026 edition of the Data Centre Construction Cost Guide, we examine data centre development costs across key Asia Pacific markets and explore the major themes influencing cost escalation and development strategies. From evolving technical specifications and sustainability considerations to supply chain constraints and market driven design shifts, this guide provides insight into the forces shaping the next generation of data centre investment across the region.

Data Centre Construction Costs

Construction costs across Asia Pacific continued to rise in 2025, increasing by an average of 10% year‑on‑year as demand intensified and supply chains remained under pressure. The five most expensive construction markets have remained consistent with continued supply chain shortages and regulatory mandates to achieve high performance and sustainability requirements. Demand in the top markets is also fueled by cloud providers aggressively chasing additional power.

 

Most Expensive Markets

(ranked by mid-range cost and based on a mid-specification build)

  1. Japan External Link
  2. Singapore External
  3. South Korea External Link
  4. Australia External
  5. Hong Kong, China External Link
当社の強み
クッシュマン・アンド・ウェイクフィールドが提供する、アジア太平洋地域のデータセンター関連サービスについて、地域別・市場別のインサイト、提供サービス、主要クライアント事例、連絡先などの詳細をご紹介しています。
詳細はこちら

related insights / news

research-hero.jpg
Research

APAC Data Centre Update: H1 2026

This report covers 9 primary and 6 secondary markets. It also features the Asia Pacific Data Centre Markets Maturity Index, which tracks 30 markets.
Andrew Green • 7/30/2026
APC Data Centre Construction per Capita_News Card Image.jpg
Malaysia, Thailand, Japan set pace on Asia Pacific data centre construction per capita through end of decade

Malaysia’s strong data centre development pipeline will see its population per megawatt ratio consolidate faster than any other Asia Pacific market between now and the end of the decade, with Thailand and Japan seeing the second and third fastest rates of consolidation, according to a new report from global real estate services firm Cushman & Wakefield.

Amy Kelly • 6/12/2025

APAC DCIR - Homepage banner-Landing-page-banner.jpg
Research • Technology

Asia Pacific Data Centre Investment Landscape

Discover the Asia Pacific data centre investment landscape. This report covers 14 markets, exploring key fundamentals like population, CapEx, and yield-on-cost.
Pritesh Swamy • 6/11/2025

CAN'T FIND WHAT YOU'RE LOOKING FOR?

Get in touch with one of our professionals.

クッシュマン・アンド・ウェイクフィールドでは、トラフィックの分析および本ウェブサイト上でベストの体験をお客様に提供するためクッキーを使用します。このダイアログを閉じ、お客様の同意を確認されるか、詳細については次のページを訪れてください:
クッキー通知

その他のオプション
同意する
これらのクッキーにより、当社のウェブサイトが期待通りに動作することが保証されます。例えば、ウェブサイトのトラフィック負荷を当社のサーバー間で分散し、使用量が特に多いときにウェブサイトがクラッシュしないようにします。
これらのクッキーは、お客様が行った選択(ユーザー名、言語、居住地域など)をウェブサイトに記憶させ、より充実した機能を提供するためのものです。これらのクッキーは、広告に使用される可能性のあるお客様の情報を収集したり、お客様がインターネット上でどこにいたかを記憶したりすることはありません。
これらのクッキーは、当社がマーケティングパートナーと協力して、お客様が当社のウェブサイトに訪問する前にどの広告やリンクをクリックしたかを理解したり、当社の広告をお客様にとってより適切なものにするために使用されます。
すべてに同意する
すべてを拒否する
設定の保存