EGI/ATI Industrial Park | Build-to-Suit | 1717 E Army Post Rd, Des Moines, IA
1717 E Army Post Rd, Des Moines, IA 50320 United States
Building Size
620,000 SF
Lot Size
37.92 Acres
Construction Status
Proposed
Max Contiguous
310,000 SF
Building Size
620,000 SF
Lot Size
37.92 Acres
Construction Status
Proposed
OVERVIEW
• Building size - Phase 1: 310,000 SF | Phase 2: 310,000 SF
• Developed by Exodus Group Investments/ATI Group
• Year Built: Proposed 2026 Delivery
• Clear Height: 32’
• Columns: 50’ x 50’ with 60’ Speed Bays
• Building Dimensions: 1,000’ x 310’
• Truck Court Depth: 185’
• Parking - Phase 1: 183 spaces w/ 72 trailer spaces | Phase 2: 188 spaces
• Zoning: I1 - Industrial District
• Climate Control: Heating - Reznor’s
• Building Construction Type: Precast concrete walls w/ R-13 insulation, steel frame
• Roof System: TPO with R-25 insulation
• Fire Protection System: ESFR Sprinkler
• Interior Lighting: LED
• Trailer Parking: 60 space drop trailer lot | 75 trailer parking spots
• Developed by Exodus Group Investments/ATI Group
• Year Built: Proposed 2026 Delivery
• Clear Height: 32’
• Columns: 50’ x 50’ with 60’ Speed Bays
• Building Dimensions: 1,000’ x 310’
• Truck Court Depth: 185’
• Parking - Phase 1: 183 spaces w/ 72 trailer spaces | Phase 2: 188 spaces
• Zoning: I1 - Industrial District
• Climate Control: Heating - Reznor’s
• Building Construction Type: Precast concrete walls w/ R-13 insulation, steel frame
• Roof System: TPO with R-25 insulation
• Fire Protection System: ESFR Sprinkler
• Interior Lighting: LED
• Trailer Parking: 60 space drop trailer lot | 75 trailer parking spots
Details
- Rental Price:
- Contact us for pricing
- Building Size:
- 620,000 SF
- Lot Size:
- 37.92 Acres
- Construction Status:
- Proposed
- Max Contiguous:
- 310,000 SF
- Min Divisible:
- 15,000 SF